Health and Safety Bournemouth, Poole and Southampton.

Site Waste Management Plans

Health and SafetyCDM CoordinatorsFire AssessmentSite Waste Management PlansContact

Site Waste Management Plan

 

We are CDM Coordinators operating throughout the UK offering companies a Site Waste Management plan at a realistic price please telephone 01425 276719.

 

What should the SWMP contain?

The level of detail that your SWMP should contain depends on the estimated build cost, excluding VAT.

For projects estimated at between £300,000 and £500,000 (excluding VAT) the SWMP should contain details of the:

  • types of waste removed from the site
  • identity of the person who removed the waste
  • site that the waste is taken to.

For projects estimated at over £500,000 (excluding VAT) the SWMP should contain details of the:

  • types of waste removed from the site
  • identity of the person who removed the waste and their waste carrier registration number
  • a description of the waste
  • site that the waste was taken to
  • environmental permit or exemption held by the site where the material is taken.

At the end of the project, you must review the plan and record the reasons for any differences between the plan and what actually happened.

You must still comply with the duty of care for waste. Because you will need to record all waste movements in one document, having a SWMP will help you to ensure you comply with the duty of care.

We like to make this process as easy for you as possible.


 
Site Waste Management plan Bournemouth, Southampton, Poole, Christchurch, Ringwood, Portsmouth, Weymouth, Dorchester, Salisbury,